| PROJECT LIST:
- Move all boats out of club house
- Commission the pump out system. Install hose and doghouse on work dock,check operation - Team Leader: Jon Fick
- Range lights: Light near shore needs to be rewired and aligned
- State Inspection and make roadworthy all five trailers
- Club dinghies in water. Add oars and zip life jacket to seat (4 persons)
- Change filter on diesel tank (1 person)
FLOATING DOCK:
- Install ramp to the floating dock (10-12 persons)
- Install pipes along side of end of floating dock (3-4 persons)
- Store winter anchors in Steward's room (2 persons)
- Attach water line and install hose (2 persons)
- Position swim platform and anchor with two small mushroom anchors (2 persons)
- Remove bubblers-pressure wash-store in grounds shed (2persons)
- Remove and store shutters on dock house (2 persons)
- Replace corner bumpers and ladder on floating dock (2 persons)
- Check electrical power and replace flood light bulbs on dock (1 person)
DINGHY DOCK:
- Use race whaler to move dinghy dock into summer position (3-4 persons)
- Pickup yellow float and attach line to anchor offshore end of dinghy dock
- Secure dock to shore and install walkway
WORK DOCK:
- Turn on power and water to dock
- Install hose, doghouse and water line for pumpout
- Check operation of hoist
LAUNCHES:
- CLEAN and WAX hulls on both launches (4-6 persons)
- Install grab rails (2 persons)
- Install batteries & check thruhulls (1 person)
- Change engine oil and filters in motors (synthetic ONLY!!)
- Clean, install, and check for all safety equipment (fire extinguisher & life jackets) (2 persons)
- Install new registration stickers and copy of reg in vessel (1 person)
- Install 7 new fenders on each boat (4 persons)
- Launch launches with truck with 2' trailer ball (4-6 persons)
- On water checkout
WHALERS:
- Clean boats, pressure wash as needed (2 persons)
- Fresh fuel in tanks
- Check oil level in motors (synthetic ONLY!!)
- Clean, install and check all safety equipment (fire extinguisher & life jackets) (2 persons)
- Install new registration stickers and copy of reg in vessel (1 person)
- Drain plugs installed from outside
- Launch race whaler with truck with 1-7/8' or 2' trailer ball (3 persons)
- Harbor Committee will take care of launching harbor whaler
- On water checkout (2 persons)
ZODIAC:
- Clean boat as required (2 persons)
- Install blue cover (2-3 persons)
- Fresh fuel in tank (1 person)
- Check oil level in motor (synthetic ONLY!!)
- Clean,install and check all safety equipment (fire extinguisher & life jackets) (2 persons)
- Install new registration stickers and copy of reg in vessel
- Launch with truck with 1-7/8' trailer ball (3 persons)
- On water checkout
TRAILERS:
- Test all lights and repair as required (3 persons)
- Inflate tires to proper pressure (2 persons)
- Verify chains are in good shape
- Locate and secure spare tires to trailers
- Locate registrations and get trailers inspected
Ready ALL boats for Vessel Safety Check by USCG Aux.
| Let me know which project interests you to take on!
Thanks....Rick
| .
|
| October 3
| Friday 7PM
| MBBC Annual Meeting
| .
| Let's have a good showing of OpsCom members at this important meeting!
|
| October 18 (tentative)
| Saturday 9AM Meet at garage door for assignments
| Club Closing
Every OpsCom member should plan on attending to help prepare the club for winter
| |
|
|
|
| PROJECT LIST:
- Decommission the pump out system. Remove hose and doghouse on work dock - Team Leader: Jon Fick
- Remove all club dinghies from water EXCEPT two. Store boats under porch. Store oars and life jackets in dock house.
FLOATING DOCK:
- Detach water line/WiFi
- Secure swim platform to side of floating dock. Take two small mushroom anchors and store in steward's room
- Install bubblers-stored in grounds shed
- Install shutters on dock house
- Remove corner bumpers and ladder on floating dock-store in grounds shed
- Turn off electrical power and remove flood light bulbs on dock
DINGHY DOCK:
- Remove dinghy dock and install in winter position
- Detach dock from shore and remove walkway
WORK DOCK:
- Turn off water to dock, flush lines
- Remove hose,doghouse and water line for pumpout
LAUNCHES:
- Remove grab rails
- Remove battery & open thruhulls
- Winterize motors
- Put in club house
ZODIAC:
- Remove from water
- Drain fuel in tank
- Drain water
- Remove USCG required safety equipment (fire extinguisher & life jackets)
- Take boat to be winterized
|
| Let me know which project interests you to take on!
Thanks....Rick
| .
|
| November 22
| Saturday 2-4PM
|
- Remove 4 pipes from floating dock
- Install two winter anchors/stored in steward's room
- Remove ramp after last J/24 Race
- Remove race whaler from water
- Remove USCG required safety equipment (fire extinguisher & life jackets)
- Remove radio and store in steward's room after marking ID
- Remove any other hardware
- Remove side boards from work dock
- Remove all club dinghies from shore EXCEPT one. Store oars under overturned dinghy
- Take race whaler to be winterized
|
| J/24 Racers, Harbor and OpsCom members
|
| .
| .
| .
| .
| .
| |